March 31, 2010
March 31, 2010 - Toronto, Ontario (March 31st, 2010) - US GOLD CORPORATION (NYSE.A: UXG - TSX: UXG) is pleased to announce an improvement in the estimated mineral resource for its 100% owned Gold Bar Project in Nevada. Measured and Indicated (M&I) resources increased 26% to 974,875 oz gold within 36.9 million tons of material with an average grade of 0.026 ounces gold per ton (opt) [0.905 grams gold per tonne (gpt)], from 772,600 oz gold within 25.1 million tons of material with an average grade of 0.031 opt (1.053 gpt). The change represents both the upgrade of mineralization from the Inferred category to M&I, and the variation resulting from new drill information and detailed re- modeling. US Gold’s current estimate incorporates over 100 new holes drilled in 2009 at the Gold Bar Project. The resource was prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards pursuant to National Instrument 43-101 (“NI 43-101”) by Telesto Nevada Inc. of Reno, Nevada.