TORONTO, ONTARIO--(Marketwire - June 21, 2010) - Minera Andes Inc. (the "Corporation" or "Minera Andes")(TSX:MAI)(OTCBB:MNEAF)
is pleased to announce that the mineral resource at our 100% owned
copper project, Los Azules, has been expanded and the confidence level
increased. A total of 137 million tonnes of the previous inferred
mineral resources have been upgraded to the indicated category, and an
additional 116 million tonnes of inferred mineral resources have been
added.
Rob McEwen, Chairman and CEO of Minera Andes commented:
"Los Azules is shaping up to be a world-class copper
deposit, and we are excited about its upside potential We have commenced
planning for the next field season with the objective of completing a
pre- feasibility study by the end of 2011."
In September of 2008, two independent qualified persons,
Robert Sim and Bruce Davis, completed a resource estimate for Los Azules
showing inferred mineral resources of 922 million tonnes grading 0.55
percent copper, equivalent to 11.2 billion pounds of copper. Based on
this season's drilling (23 holes totaling 10,007 meters) Mr. Sim and Mr.
Davis have prepared an updated estimate, results of which are outlined
in the table below. Due to tightening of the drill hole spacing,
portions of the resource were upgraded to the indicated category. Also,
the inferred mineral resources increased due to a combination of
step-out holes drilled at the north end of the deposit and greater drill
hole depths.
| |
| Cut-off grade of 0.35% was applied to both 2008 and 2010 estimates |
| * Sept 26, 2008 technical report available on Sedar |
Drilling this year was also successful in further delineating and
expanding the high-grade secondary enrichment zone. We use a cut-off
grade of 0.70% copper to define "high-grade" mineralization. The
high-grade mineralization approximates the secondary enrichment zone,
but it is not exactly coincident. The portions of the deposit that
exceeded the 0.70% copper limit based on previous drilling totaled 161
million tonnes at an average grade of 0.87% copper. The updated estimate
shows a slight increase in grade for portions exceeding 0.70% copper
compared to the previous resource estimate. Results are outlined below.
| |
| *Sept 26, 2008 technical report available on Sedar |
The approximate limits of the mineralization are shown on the
attached plan view map (Figure 1). Longitudinal and cross sections
through the central portions of the deposit generated from the mineral
resource model are shown on Figures 2 and 3.
Drilling Results
The location of the 23 holes drilled during the 2009-2010
field season are shown on Figure 1, and the assay results for the final
six holes of this season are reported in Table 1. The results from these
holes are generally consistent with the results of the other holes
drilled this year, and were included in the new mineral resource
estimate. Highlights include good intercepts in the secondary enrichment
zone of 0.70% Cu over 118 meters in Hole 62 and 0.81% Cu over 138
meters in Hole 63. Hole 63 also contains 0.74% Cu as primary
mineralization in the bottom 141 meters of the hole.
Geophysical Survey
During this field season Quantec Geoscience Ltd. completed a
Titan 24™ Deep Earth Imaging geophysical survey. The purpose of this
survey was to identify drilling targets at Los Azules.
The survey identified a number of promising anomalies, particularly to the southwest of the existing deposit.
The results of the geophysical survey for Los Azules will be
integrated with an updated geological interpretation of this year's
drilling in order to pinpoint new targets for the coming field season.
About Los Azules
Los Azules is a large copper porphyry system located in
western San Juan Province, in Argentina. The Los Azules project is
contained in a region consisting of other major porphyry copper deposits
straddling the Chilean/Argentine border. This belt contains some of the
world's largest copper deposits, including Codelco's El Teniente and
Andina mines, Anglo American's Los Bronces mine, Antofagasta PLC's Los
Pelambres mine and Xstrata's El Pachón project, among others.
About Minera Andes
Minera Andes is an exploration company exploring for gold,
silver and copper in Argentina with three significant assets: A 49%
interest in Minera Santa Cruz SA, owner of the San José Mine, a large
primary silver producer that produced 4,998,000 million oz silver and
77,070 oz gold in 2009; 100% ownership of the Los Azules copper deposit;
and a portfolio of exploration properties in the highly prospective
Deseado Massif region of Santa Cruz Province in southern Argentina. The
Corporation had $15 million USD in cash as at March 31, 2010 and no
debt.
This news release has been submitted by Jim Duff, Chief Operating Officer of the Corporation.
For further information, please contact: Jim Duff or visit our Web site: www.minandes.com.
Scientific and Technical Information:
The mineral resource estimate presented in this press
release has been reviewed and approved by Robert Sim, P.Geo. and Bruce
Davis, PhD, FAusIMM, both independent Qualified Persons as defined by
National Instrument 43-101 "Standards of Disclosure for Mineral
Projects" ("NI 43-101"). Robert Sim and Bruce Davis are responsible for
the mineral resource estimate. The drill hole results presented in Table
1 of this press release have been reviewed and approved by Nivaldo
Rojas, President of Rojas & Asociados Mining Consultants, a mining
engineer and independent consultant to the Corporation, who is a
Qualified Person as defined by National Instrument 43-101, and who is
responsible for oversight and review of the exploration program at the
Los Azules Project. Bruce Davis is responsible for the quality control
for the assaying of the Los Azules drill core. All samples were
collected in accordance with industry standards. Splits from the drill
core samples were submitted to the ACME sample preparation laboratory in
Mendoza, Argentina and then transferred to ACME's laboratory in
Santiago, Chile for fire assay and ICP analysis. Accuracy of results is
tested through the systematic inclusion of standards, blanks and check
assays.
Mineral resources are generated using ordinary kriging
with a nominal block size of 20x20x15m. Block grade estimates are
derived from drill hole sample results and the interpretation of a
geologic model which relates to the spatial distribution of copper,
gold, silver and molybdenum in the deposit. There are a total of 114
drill holes in the Los Azules database with a cumulative length of
30,997 meters and a total of 15,260 samples analyzed for a suite of
elements including total copper, gold, silver and molybdenum. A total of
58 of the drill holes have some portion of the sample intervals tested
for sequential copper analysis. This information contributed to the
development of the mineral zone domains. The portion of the new mineral
resource that has been defined as "indicated" is based on a drilling
configuration that exhibits the degree of continuity required for higher
level mineral resources. Inferred mineral resources are limited to
blocks within a maximum distance of 200 meters from a drill hole. As
required by NI 43-101, the possible future economic viability of the
mineral resource has been exhibited by restriction within a pit shell
derived about the copper content in indicated and inferred class blocks
at a copper price of $2.50/lb, total operating costs of $5.25/tonne and
an average pit slope of 34 degrees. Mineral resources are presented at a
cut-off grade of 0.35%Cu, which is the same base cut-off grade used in
the 2008 mineral resource estimate. These are mineral resources, not
mineral reserves.
For further information in respect of the Los Azules
project please refer to the technical report entitled "Canadian National
Instrument 43-101 Technical Report in Support of the Preliminary
Assessment on the Development of the Los Azules Project, San Juan
Province, Argentina" dated March 19, 2009, the "Los Azules Report"
prepared by Randolph P. Schneider, Robert Sim, Bruce Davis, William L.
Rose and Scott Elfen, each of whom is "independent" of the Corporation
and a "qualified person" for the purposes of NI 43-101. This report is
available on SEDAR (www.sedar.com).
Inferred mineral resources are considered too speculative geologically
to have the economic considerations applied to them that would enable
them to be categorized as mineral reserves.There is no certainty that
the project as described in the Los Azules Report will be realized.
Cautionary Note to U.S. Investors:
All resource estimates reported by the Corporation were
calculated in accordance with NI 43-101 and the Canadian Institute of
Mining and Metallurgy Classification system. These standards differ
significantly from the requirements of the U.S. Securities and Exchange
Commission. Mineral resources which are not mineral reserves do not have
demonstrated economic viability.
Caution Concerning Forward-Looking Statements:
This press release contains certain forward-looking
statements and information. The forward-looking statements and
information express, as at the date of this press release, the
Corporation's plans, estimates, forecasts, projections, expectations or
beliefs as to future events and results and management's understanding
of proposed legislative changes. Forward-looking statements involve a
number of risks and uncertainties, and there can be no assurance that
such statements will prove to be accurate. Therefore, actual results and
future events could differ materially from those anticipated in such
statements. Risks and uncertainties that could cause results or future
events to differ materially from current expectations expressed or
implied by the forward-looking statements include, but are not limited
to, factors associated with fluctuations in the market price of precious
metals, mining industry risks, risks associated with foreign
operations, risks related to litigation, property title, the state of
the capital markets, environmental risks and hazards, uncertainty as to
calculation of mineral resources and reserves and other risks.
Readers should not place undue reliance on
forward-looking statements or information. The Corporation undertakes no
obligation to reissue or update forward-looking statements or
information as a result of new information or events after the date
hereof except as may be required by law. See the Corporation's annual
information form for additional information on risks, uncertainties and
other factors relating to the forward-looking statements and
information. All forward-looking statements and information made in this
news release are qualified by this cautionary statement.
To view the maps associated with this press release, please visit the link below:
http://media3.marketwire.com/docs/mineraandes.pdf
Table 1 – Summary of Drill Hole Results for Holes 62 through 67
Hole 62 (-90º) Hole terminated at 280.0 m due to bad ground conditions
| Intersection |
Vertical Thickness (m) |
% Cu |
Comments |
| from (m) |
to (m) |
| 0 |
3.0 |
3.0 |
- |
Gravel overburden |
| 3.0 |
130.0 |
127.0 |
0.01 |
Leached cap |
| 130.0 |
248.0 |
118.0 |
0.70 |
Secondary enrichment zone |
| 248.0 |
280.0 |
32.0 |
0.40 |
Chalcopyrite with local weak chalcocite enrichment |
Hole 63 (-90º)
| Intersection |
Vertical Thickness (m) |
% Cu |
Comments |
| from (m) |
to (m) |
| 0 |
46.0 |
46.0 |
- |
Gravel overburden |
| 46.0 |
94.0 |
48.0 |
0.07 |
Leached cap |
| 94.0 |
232.0 |
138.0 |
0.81 |
Secondary enrichment |
| 232.0 |
286.0 |
54.0 |
0.43 |
Primary chalcopyrite and bornite veinlets and disseminations with weak chalcocite enrichment |
| 286.0 |
427.1 |
141.1 |
0.74 |
Primary chalcopyrite and bornite veinlets and disseminations with weak chalcocite enrichment |
Hole 64 (-90º) Hole suspended at end of season. The hole will be re-entered and completed next season.
| Intersection |
Vertical Thickness (m) |
% Cu |
Comments |
| from (m) |
to (m) |
| 0 |
3.0 |
3.0 |
- |
Gravel overburden |
| 3.0 |
136.0 |
133.0 |
0.01 |
Leached cap |
| 136.0 |
170.1 |
34.1 |
0.47 |
Chalcopyrite veinlets and disseminations with weak chalcocite enrichment |
Hole 65 (-75º) at 260ºAzimuth
| Intersection |
Vertical Thickness (m) |
% Cu |
Comments |
| from (m) |
to (m) |
| 0 |
22.0 |
21.3 |
- |
Gravel overburden |
| 22.0 |
148.8 |
122.5 |
0.02 |
Leached cap |
| 148.8 |
214.0 |
63.0 |
0.33 |
Mixed primary and secondary mineralization |
| 214.0 |
362.0 |
143.0 |
0.21 |
Chalcopyrite with local weak chalcocite enrichment |
| 362.0 |
388.0 |
25.1 |
0.34 |
Chalcopyrite with local weak chalcocite enrichment |
| 388.0 |
431.0 |
41.5 |
0.18 |
Primary chalcopyrite veins and disseminations |
Hole 66 (-75º) at 260ºAzimuth Hole suspended at end of season. The hole will be re-entered and completed next season.
| Intersection |
Vertical Thickness (m) |
% Cu |
Comments |
| from (m) |
to (m) |
| 0 |
50.0 |
48.3 |
- |
Gravel overburden |
| 50.0 |
118.4 |
66.1 |
0.02 |
Leached cap |
| 118.4 |
150.0 |
30.5 |
0.58 |
Secondary enrichment zone |
| 150.0 |
204.0 |
52.2 |
0.24 |
Primary chalcopyrite-bornite veinlets and disseminations |
| 204.0 |
257.5 |
51.7 |
0.35 |
Primary chalcopyrite veinlets and disseminations |
Hole 67 (-90º) Hole suspended at end of season. The hole will be re-entered and completed next season.
| Intersection |
Vertical Thickness (m) |
% Cu |
Comments |
| from (m) |
to (m) |
| 0 |
56.6 |
56.6 |
|
Gravel overburden |
| 56.6 |
89.7 |
33.1 |
0.03 |
Leached cap |
| 89.7 |
161.4 |
71.7 |
0.29 |
Primary chalcopyrite veinlets and disseminations with weak chalcocite enrichment |
The
TSX has not reviewed and does not accept responsibility for the
adequacy or accuracy of the contents of this news release, which has
been prepared by management.
For more information, please contact
Minera Andes Inc.
James K. Duff
Chief Operating Officer
Toll-Free: 1-866-441-0690 or 647-258-0395
647-258-0408 (FAX)
info@minandes.com
www.minandes.com