TORONTO, ONTARIO--(Marketwire - Oct. 7, 2010) - Minera
Andes Inc. (the "Corporation" or "Minera Andes") (TSX:MAI)(OTCBB:MNEAF)
is pleased to announce the discovery of nine new high-grade gold/silver
veins plus important extensions of two other veins, which together
total more than five kilometres in strike length. The discoveries
represent significant exploration progress at San José where the total
strike length of all the previously known veins totalled approximately
17 kilometres. The new veins are located primarily between the Kospi and
Frea veins, and can be accessed from existing mine workings (see
Exhibit 1).
Rob McEwen, Chairman and CEO of Minera Andes, said:
"We
are very excited by the discovery of the new veins at the San José
mine. The drilling results demonstrate that the area in and around the
San José mine is extremely prospective, and we anticipate these new
veins will significantly extend the mine life. Recent events such as the
$3.6 billion bid for Andean's nearby Cerro Negro property highlight the
world class potential of this emerging gold/silver district."
Selected
assay results for three of the most promising new veins are shown
below. The complete assay results for the new veins and vein extensions
are provided in Exhibit 2. All of the drilling reported in this press
release was completed during 2010. The assays reported below and in
Exhibit 2 were analyzed by Alex Stewart Argentina SA laboratory in
Mendoza, Argentina, and received up until August 25th 2010.
The widths shown below are true widths (normal to the dip of the
vein). Longitudinal sections of the new veins and extensions are
provided in Exhibit 3.
- Micaela Vein – 1,380 meter strike length, cut by 36 diamond drill holes.
Hole SJD-708 - 2.45 m (meters) at 8.33 g/t (grams/tonne) Au and 1,484 g/t Ag
Hole SJD-786 – 1.09 m at 33.50 g/t Au and 2752 g/t Ag
Hole SJD-807 – 0.53 m at 31.02 g/t Au and 629 g/t Ag
- Sofía Vein – 600 meter strike length, cut by 20 diamond drill holes.
Hole SJD-477 – 1.52 m at 7.71 g/t Au and 885 g/t Ag
Hole SJD-486 – 10.13 m at 14.96 g/t Au and 1096 g/t Ag
Hole SJD-491 – 5.45 m at 13.54 g/t Au and 206 g/t Ag
Hole SJD-726 – 1.72 m at 10.94 g/t Au and 1255 g/t Ag
- Antonella Vein – 870 meter strike length, cut by 13 diamond drill holes.
Hole SJD-524 – 5.30 m at 13.43 g/t Au and 199 g/t Ag
The
following table provides a summary of new veins and extensions, the
number of drill holes used to define the veins and the strike length of
each. Complete assay data is provided in Exhibit 2.
The
discoveries are a direct result of a significant increase in the
exploration effort at San José compared to previous years. From the
start of 2010 through September 25, 2010, a total of 47,431 meters have
been completed in 233 diamond core holes, nearly double the drilling
undertaken in 2009. The success of the current drilling is in large part
a result of extensive surface geophysical surveys conducted during 2009
and 2010 that led to the development of the targets drilled this
year. The geophysics consisted of 181 line-kilometres of induced
polarity ("IP")/resistivity, 55 line-kilometres of magnetics and 11
line-kilometres of pole-dipole IP. An updated 43-101 Report scheduled to
be completed in the near future is being prepared that will contain
full details of the 2010 and 2009 drilling.
A
significant portion of the property continues to be open at depth and
laterally. The discovery of the Micaela-Sofía vein system, which trends
approximately east-west, is especially important because its orientation
is different from the typical northwest trend of all the other veins at
San José. The discovery of this system, which does not outcrop, will be
used as an exploration guide to open up new exploration opportunities
on the property. In addition, exploration drilling is continuing to
expand resources in the known veins, including Ayelén and Odin, and
exploration is also continuing in other areas of the property, such as
the Saavedra and Aguas Vivas targets.
The
Mineral Reserves and Resources for the San José mine as at December 31,
2009 were audited by P&E Mining Consultants and reported in the
Corporation's 2009 Annual Report (AIF), and are given in the following
table.
None
of the new veins are included in the December 31, 2009 resource or
reserve estimate. An updated 43-101 Technical Report to be completed in
the near future will include updated resource estimates including the
new veins.
About Minera Andes Minera
Andes is an exploration company exploring for gold, silver and copper
in Argentina with three significant assets: A 49% interest in Minera
Santa Cruz SA, owner of the San José Mine in close proximity to Andean
Resources' Cerro Negro project; 100% ownership of the Los Azules copper
deposit with an inferred mineral resource of 10.3 billion pounds of
copper and an indicated resource of 2.2 billion pounds of copper; and,
100% ownership of a portfolio of exploration properties bordering
Andean's Cerro Negro project in Santa Cruz Province. The Corporation had
$8 million USD in cash as at June 30th2010 with no bank debt. Rob McEwen, Chairman and CEO, owns 33% of the company.
About Minera Santa Cruz Minera
Santa Cruz SA is a joint venture owned 51% by Hochschild Mining
Argentina, a wholly owned subsidiary of Hochschild Mining plc, and 49%
by Minera Andes S.A., a wholly owned subsidiary of the Corporation. The
joint venture owns and operates the San José property.
About Hochschild Mining plc Hochschild
Mining plc is a leading precious metals company listed on the London
Stock Exchange (HOCM.L / HOC LN) with a primary focus on the
exploration, mining, processing and sale of silver and gold. Hochschild
has over forty years of experience in the mining of precious metal
epithermal vein deposits and currently operates four underground
epithermal vein mines, three located in southern Peru, one in southern
Argentina and one open pit mine in northern Mexico. Hochschild also has
numerous long-term prospects throughout the Americas.
This
news release has been submitted by Jim Duff, Chief Operating Officer of
the Corporation. For further information, please contact Jim Duff or
Daniela Ozersky or visit our Web site: www.minandes.com.
Technical Information
This
news release has been reviewed and approved by Allen V. Ambrose, a
Qualified Person as defined by National Instrument 43-101. Mr. Ambrose
is a former officer and current member of the board of directors of
Minera Andes. Assay results were reported to Minera Andes by MSC, which
is the operating company for the San José joint venture. Assay results
for the drilling were reviewed by Allen Ambrose. All samples were
collected in accordance with industry standards. All drill core samples
were submitted to Alex Stewart Argentina S.A laboratory in Mendoza,
Argentina for fire assay and ICP analysis. Accuracy of results is tested
through the systematic inclusion of standards, blanks and check
assays. Allen Ambrose has reviewed the results of the check assays and
other quality control measures.
The
December 31, 2009 resource and reserve estimates were audited by
P&E Mining Consultants to confirm that they are in compliance with
NI 43-101 and CIM and that the employed methodologies have generated
reliable estimates of tonnage and grade for the mineral assets stated in
the Corporation's Annual Report (AIF) dated March 30, 2010. The audit
was carried out by James L. Pearson P.Eng., Alfred Hayden P.Eng. and
Fred Brown CPG PrSciNat under the direction of P&E Mining
Consultants President Eugene Puritch, P.Eng. All of the named persons
associated with P&E Mining Consultants are considered to be
independent Qualified Persons under the NI 43-101 guidelines.
Cautionary Note to U.S. Investors:
All
resource estimates reported by the Corporation are calculated in
accordance with NI 43-101 and the Canadian Institute of Mining and
Metallurgy Classification system. These standards differ significantly
from the requirements of the U.S. Securities and Exchange Commission.
Mineral resources that are not mineral reserves do not have demonstrated
economic viability.
Caution Concerning Forward-Looking Statements:
This
press release contains certain forward-looking statements and
information. The forward-looking statements and information express, as
at the date of this press release, the Corporation's plans, estimates,
forecasts, projections, expectations or beliefs as to future events and
results. Forward-looking statements involve a number of risks and
uncertainties, and there can be no assurance that such statements will
prove to be accurate. Therefore, actual results and future events could
differ materially from those anticipated in such statements. Risks and
uncertainties that could cause results or future events to differ
materially from current expectations expressed or implied by the
forward-looking statements include, but are not limited to, factors
associated with fluctuations in the market price of precious metals,
mining industry risks, risks associated with foreign operations, risks
related to litigation, property title, the state of the capital markets,
environmental risks and hazards, uncertainty as to calculation of
mineral resources and reserves and other risks.
Readers
should not place undue reliance on forward-looking statements or
information. The Corporation undertakes no obligation to reissue or
update forward-looking statements or information as a result of new
information or events after the date hereof except as may be required by
law. See the Corporation's Annual Information Form for additional
information on risks, uncertainties and other factors relating to the
forward-looking statements and information. All forward-looking
statements and information made in this news release are qualified by
this cautionary statement.
To view Exhibit 1 - Plan Map of San Jose Mine veins showing new veins in red, please visit the following link: http://media3.marketwire.com/docs/mai_10_07_2010_exhibit_1.pdf
Exhibit 2 – Complete Drilling Results to Date for the New Veins
To view Exhibit 3 - Longitudinal Sections, please visit the following link:http://media3.marketwire.com/docs/mai_10_07_2010_exhibit_3.pdf
The
TSX has not reviewed and does not accept responsibility for the
adequacy or accuracy of the contents of this news release, which has
been prepared by management.