SPOKANE, WA----November 26, 2007----
Minera Andes Inc. (TSX: MAI and US OTC: MNEAF) is pleased to announce
results of a NI 43-101 Technical Report to be filed that includes new
mineral resources identified from 2007 exploration drilling,
underground development, and conversion of 2006 mineral resources into
mineral reserves at the San José project in Santa Cruz province,
southern Argentina. In addition the report also quantifies areas of
mineral potential based on drilling. The San José mining operation is
expected to reach full production of 750 tonnes per day (t/d) by
year-end and the process plant in commissioning is forecast by Minera
Andes to reach full capacity in first half of 2008. The San José
project is operated by Minera Santa Cruz S.A. ("MSC") (owned 51% by
Hochschild Mining plc ("Hochschild") (HOC.L Reuters, HOC.LN Bloomberg,
London Stock Exchange) and 49% by Minera Andes.
Some highlights of the new Technical Report by AMEC Americas
Limited (AMEC) are as follows (all amounts are expressed in U.S.
dollars, unless otherwise indicated):
• Proven and Probable Mineral Reserves: at June 30,
2007 are: 2.4 million tonnes grading 6.79 g/t gold and 430 g/t silver.
The economic cutoff used to calculate the reserves is $94/t (using a
price of $500 for gold and $9.00 for silver).
• Gold contained: 602,000 ounces of Proven and Probable Mineral Reserves
• Silver contained: 33 million ounces of Proven and Probable Mineral Reserves
• Production: 750 t/day at full production mining rate
• Forecast average operating costs of: $3.92 per ounce silver equivalent
• Mine life increased from 5.2 yrs to 9 yrs
• Forecast average gold production: 64,000 ounces per year at full production
• Forecast average silver production: 3.9 million ounces per year at full production
• Mineral potential was estimated for three targets to total:
1.6-3.4 million tonnes, with 6-10 g/t gold and 200-600 g/t silver
The new Technical Report by AMEC entitled "San José Property San Cruz
Province, Argentina NI 43-101 Technical Report", was authored by
Pierre Rocque (P. Eng.), William Colquhoun (FSAIMM), Emmanuel Henry
MAusIMM (C.P.), and Armando Simon, R.P. Geol., AIG, appropriately
qualified persons according to NI 43-101. The results from the new
report indicate that the 2006 core drilling program (128 holes
totaling 22,047 meters) and 2007 development and drilling on the Kospi
and Frea veins at San José increased silver and gold reserves by 100%
from the level announced in the our September 2007 Technical Report.
Work at San José in 2007 has increased the mineral resources and
mineral reserves from a 38,000-meter exploration drilling campaign
currently underway, and development of the underground workings. We
expect further increases in the mineral reserves and mineral resources
from these programs. At the current mining production rate of 750
t/d the new mineral reserves that include the Kospi vein indicate a
mine life of 9 years at San José an increase of 73 percent over the
existing mine life of 5.2 years.
Allen Ambrose, president of Minera Andes, said "Even with the new
drilling, less than 15% of the known 40 kilometers of the vein trends at
San José have been drilled. The drilling in 2006-2007 has increased
the mine's mineral reserves by 100%. The joint venture is drilling
38,000 meters in the current exploration program to define new mineral
reserves and continue evaluating new targets. With commissioning of
the mine and the ramping up of production it is an exciting time for
Minera Andes. Now we are developing the mineral reserves to support
the plans of MSC to double production to 1,500 t/d. The mineral
potential estimates on drilled targets further highlights the
potential to increase the mineral reserves."
Mineral Potential
The new Technical Report also estimates the mineral potential at San
José based on drilling outside the existing mineral reserves/resources.
Mineral potential was estimated using long section based blocks with 2
to 8 drill holes per target for the Odin, Aylen, and Frea extension
targets. The mineral potential for these targets based on the current
drilling is estimated to total 1.6 to 3.4 million tonnes ranging from 6
to 10 g/t gold and 200 to 600 g/t silver.
The estimation used a conventional method, based on the interpretation
of mineralized blocks on vertical longitudinal sections, the
calculation of block areas, average horizontal widths and weighted
average grades of the mineralized intersections, and the subsequent
calculation of block tonnages and weighted average grades.
AMEC's estimation has also considered the following procedures and assumptions:
- For Ayelén and Odín, AMEC used the composite vein true
thicknesses and grades provided by Minera Andes. Composite grades were
capped at 10 g/t Au and 500 g/t Ag.
- For Frea, AMEC used the individual sample lengths and
assays. Individual assays were capped at 25 g/t Au and 1,000 g/t Ag. In
such cases where splits were present in the proximity of the main vein
(less than 10 m along the hole), the estimation considered the
combined thickness and weighted average grade of the split and the
vein. Splits located at greater distances were not included in the
estimation.
- For the estimation of horizontal thicknesses, AMEC
assumed that all veins dip 70°, and that all holes were drilled with 50°
dip.
- Whenever necessary, horizontal thicknesses were diluted to 1 m minimum mining width.
- AMEC considered a 2.65 t/m3 bulk density.
It should be emphasized that this estimation is conceptual in nature,
that there has been insufficient exploration to define a mineral
resource, and that it is uncertain if further exploration will result in
the target being delineated as a mineral resource.
Potential Tonnages and Grades of Selected Exploration Targets
Vein target |
Tonnage (Million tonnes) |
Gold (g/t) |
Silver (g/t) |
Minimum
(Min) |
Maximum
(Max) |
Min |
Max |
Min |
Max |
Ayelén |
0.2 |
0.4 |
7 |
11 |
300 |
700 |
Odin |
1.0 |
2.0 |
6 |
10 |
200 |
600 |
Frea Extensions |
0.4 |
1.0 |
6 |
10 |
200 |
600 |
Total |
1.6 |
3.4 |
6 |
10 |
200 |
600 |
San José Mine
The drilling completed on the San José mine at year end 2006 to June
30th, 2007 indicate an increase of 88% in contained gold and silver and
the mine now contains over 71 million silver equivalent ounces in the
Proven and Probable Mineral Reserve categories (see reserves tables
below). This increase in mineral reserves is primarily due to the
addition of the Kospi vein and new development and drilling on trend of
the Frea vein. Estimated mine life is 9.0 years with the current
reserves at a 750 t/d mining rate.
The Kospi vein, discovered in 2005, is the first target that has been
converted to a mineral reserve out of several high-priority drill
targets identified on the property through early reconnaissance drilling
and surface exploration programs. Other priority targets are Odin (A
and B), Ayelen, Flor, Huevos Verdes West, Kospi 1, Kospi South,
Lourdes, Frigga, Aguas Vivas, Roadside, and Portuguese West. Though
these targets are early stage we believe that they have significant
discovery potential for gold and silver mineralization. Drilling is
planned for these targets as part of an ongoing 38,000 meter, $4
million exploration drilling program started earlier this year.
Currently over 10,000 meters have been drilled for this field seasons
2007-2008 program.
The technical report by AMEC, uses a long-term gold price of $575 per
ounce (oz) and $9.00 per oz for silver for estimating mineral reserves
in its economic analysis. The average cash operating costs are
estimated at $94/tonne of ore processed, or $235/ounce gold equivalent.
AMEC estimates the San José a remaining capital expense from the
initial capital cost budget to the amount of approximately $20.8
million. The base case Net Present Value (NPV), using an 8% discount
rate, is $91 million. Based on the parameters listed above, the
undiscounted NPV representing cumulative cash flow is $150 million.
The San José mine is ramping up to full commercial production from the
start up in the third quarter of 2007 to full commercial production.
Approximately eleven kilometers of underground workings have been
developed at the mine along with the associated infrastructure. Power is
supplied by four diesel generators. The mine is designed to produce
750 t/d of ore from three separate structures, the Frea, Huevos
Verdes, and Kospi veins, using underground mining methods. Mechanized
cut and fill mining will be used as the primary mining method
supplemented with conventional cut and fill mining.
The processing facility utilizes a Gekko Gravity-Flotation-Intensive
Leaching (GFIL) process, direct electro winning and resin column
absorption for the production of the final product a gold-silver doré.
Due to the potential for additional risk with a newer process
technology that might result in lower throughput and metallurgical
recoveries AMEC has reduced expected recovery of gold to 75% and
silver to 65% in the first year of production. They have assumed the
average life of mine recovery of 90% for gold and 88% for silver in
the second year. As a result there is some risk that additional plant
modifications and commissioning time could be required to achieve
these increased recoveries and that there would be additional capital
costs.
Mineral Resources, Reserves
The new San José mineral resource and mineral reserve estimates, mine
life, and mining rates, disclosed herein are based on work from our
joint venture partner that was audited and adjusted by independent
qualified persons Emmanuel Henry, MAusIMM (CP), and Pierre Rocque, P.
Eng. at AMEC. The mineral resources and reserves remain open along
strike and at depth in some areas.
At June 30, 2007 total Measured and Indicated Mineral Resources at the
San José Project were 602,000 ounces of gold and 38.0 million ounces of
silver, contained in 2.4 million tonnes grading 7.91 g/t gold and 500
g/t silver or 74 million ounces of silver on a silver equivalent
basis (see table below). An additional 58,000 ounces of gold and 3.3
million ounces of silver, in 230,000 tonnes, grading 7.80 g/t gold and
452 g/t silver are classified as inferred resources. The economic
NSR cutoff used to estimate the mineral resources is $45/t (using a
price of $500 per ounce for gold and $9.00 per ounce for silver). Gold
mill recovery used for the mineral resource estimate is 89.65% and
silver mill recovery is 90.49%. Gold commercial recovery used for the
mineral resource estimate is 99.68% and 99.75%.
Mineral Resources* -- Measured and Indicated
Area Resources
(6/30/07) |
Grades |
Classified Resource |
Contained Ounces |
Au (g/t) |
Ag (g/t) |
Total Resource (t) |
Measured (t) |
Indicated
(t) |
Gold
(oz) |
Silver
(oz) |
Silver equivalent
(oz) |
Huevos Verdes |
7.04 |
520 |
616,000 |
290,000 |
325,000 |
139,000 |
10,296,000 |
17,941,000 |
Frea |
8.72 |
384 |
950,000 |
354,000 |
596,000 |
266,000 |
11,745,000 |
26,375,000 |
Kospi |
7.63 |
622 |
800,000 |
0 |
800,000 |
196,000 |
15,991,000 |
26,771,000 |
Total Project
06/30/07 |
7.91 |
500 |
2,365,000 |
645,000 |
1,721,000 |
602,000 |
38,032,000 |
71,143,000 |
Total Project
Oct. 21, 2005 |
9.32 |
494 |
1,097,000 |
167,000 |
930,000 |
327,000 |
17,343,000 |
35,328,000 |
Total Project Dec 31, 2006 |
8.33 |
522 |
1,779,000 |
291,000 |
1,488,000 |
477,000 |
29,847,000 |
56,083,000 |
Percentage change since Dec 31, 2006 |
|
|
+33 |
|
|
+26 |
+27 |
+27 |
*Note: Contains 100 percent of the resources, Minera Andes ownership
of the project is 49%. Mineral Resources are inclusive of mineral
reserves. Mineral resources that are not mineral reserves do not have
demonstrated *Note: Contains 100 percent of the resources, Minera
Andes ownership of the project is 49%. Mineral Resources are inclusive
of mineral reserves. Mineral resources that are not mineral reserves
do not have demonstrated
At June 30th, 2007 the Proven and Probable Mineral Reserves, based on
an overall NSR cutoff off of $94/t (using a price of $500/oz for gold
and $9.00/oz for silver), are 2.4 million tonnes at 6.79 g/t gold and
430 g/t silver, containing 521,000 ounces of gold and 32,986,000 ounces
of silver. The mineral reserves also take into account marginal blocks
of ore located on the periphery of higher grade zones. The NSR cutoff
for these blocks was $45/t. The marginal cutoff was defined by the value
of ore, which meets the variable costs, but not the fixed costs. A 15%
unplanned dilution and a 5% mining loss are used in the calculation for
the October 21, 2005 mineral reserves and a 12% unplanned dilution and
5% mining loss has been used in the April 30th, 2007 and June 30th, 2007
mineral reserve estimations.
Mineral Reserves* - Proven and Probable
Area Reserves
(6/30/07) |
Grades |
Classified Reserve |
Contained Ounces |
Au (g/t) |
Ag (g/t) |
Total Reserve
(t) |
Proven
(t) |
Probable (t) |
Gold
(oz) |
Silver
(oz) |
Silver Equivalent (oz) |
Huevos Verdes |
5.62 |
417 |
595,000 |
307,000 |
288,000 |
108,000 |
7,974,000 |
14,454,000 |
Frea |
7.77 |
343 |
937,000 |
350,000 |
587,000 |
234,000 |
10,321,000 |
24,361,000 |
Kospi |
6.52 |
536 |
854,000 |
- |
854,000 |
179,000 |
14,722,000 |
25,462,000 |
Total Project Oct. 21, 2005 |
7.7 |
406 |
1,160,859 |
174,241 |
986,626 |
288,000 |
15,229,000 |
32,515,000 |
Total Project
4/30/07 |
7.89 |
417 |
1,195,000 |
311,000 |
884,000 |
303,000 |
16,028,000 |
34,224,000 |
Total Project
6/30/07 |
6.79 |
430 |
2,386,000 |
657,000 |
1,729,000 |
521,000 |
33,017,000 |
64,277,000 |
Percentage Change |
|
|
+100 |
|
|
+72 |
+106 |
+88 |
*Note: Contains 100 percent of the reserves, Minera Andes ownership
of the project is 49%. Silver/gold equivalency 1oz Au = 60 oz Ag.
The mineral resource and mineral reserve estimates are based on
(76,478 meters) 472 drill holes and trenches and 2,733 channel samples
taken from underground workings constructed at Huevos Verdes, Frea, and
Kospi. The nominal spacing at Huevos Verdes and Frea is approximately 35
meters along strike (horizontally) and 50 meters vertically and at
Kospi it is approximately 40 meters by 40 meters.
The following summarizes the key assumptions, parameters and methods used in the mineral resource and mineral reserve estimates:
* Gold assays were cut to 65 g/t, 10 g/t, 50 g/t, 50 g/t and 50 g/t
and 30 g/t at Huevos Verdes South, Central, North, Ramal, at Frea, and
at Kospi, respectively. Silver assays were cut to 6,000 g/t, 500 g/t,
4,000 g/t, 5,000 g/t, 3,000 g/t and 2,700 g/t at Huevos Verdes South,
Central, North, Ramal, at Frea and at Kospi, respectively.
* Density values used for the estimate are 2.595 t/m3 for Huevos Verdes, 2.611 t/m3 for Frea and Kospi.
* The geological model was developed using a series of northeast
oriented sections spaced approximately 5 meters to 50 meters apart.
* Assays were composited to full vein-width interval.
* The estimation was done using Ordinary Kriging coupled with oriented search ellipses.
* Block grades were estimated based on interpretation of geological parameters logged in drill holes.
* Included in the mineral resource estimate at Huevos Verdes and Frea
are 2,733 chip channel samples taken from the underground workings.
Minera Andes is a gold, silver and copper exploration company working
in Argentina. The Corporation holds about 410,000 acres of mineral
exploration land in Argentina including the co-owned San José
silver/gold mine that has started initial production. Minera Andes is
also exploring the Los Azules copper project in San Juan province, where
an exploration program is underway to define a resource. Other
exploration properties, primarily silver and gold, are being evaluated
in southern Argentina. The Corporation presently has 166,832,517 shares
issued and outstanding.
Allen V. Ambrose, Minera Andes' President, who is an appropriately
"qualified person" as defined by National Instrument 43-101, has
supervised the preparation of the information in the news release.
This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc.
For further information, please contact: Art Johnson at the Spokane
office, or Krister A. Kottmeier, investor relations -- Canada, at the
Vancouver office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Road; Ste. A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: info@minandes.com
Vancouver Office
911-470 Granville Street
Vancouver, B.C. V6C 1V5
Phone: (604) 689-7017; 877-689-7018
E-mail:ircanada@minandes.com
Caution Concerning Forward-Looking Statements:
This press release contains certain "forward-looking statements",
including, but not limited to, the statements regarding the Company's
strategic plans, evolution of mineral resources and reserves, work
programs, development plans and exploration budgets at the Company's San
José Project. Investors should be aware that the introduction of new
technology such as ILR can create added risk in achieving metallurgical
performance. The forward-looking statements express, as at the date of
this press release, the Company's plans, estimates, forecasts,
projections, expectations or beliefs as to future events and results.
Forward-looking statements involve a number of risks and uncertainties,
and there can be no assurance that such statements will prove to be
accurate. Therefore, actual results and future events could differ
materially from those anticipated in such statements. In particular,
there can be no assurance that commercial production at the San José
mine will be achieved on a timely basis, or at all, that production
capacity at the San José mine will be successfully increased, that
resources and reserves at the San José mine will be increased or that
Minera Andes will successfully raise the funds necessary to maintain its
interest in the San José mine. Risks and uncertainties that could cause
results or future events to differ materially from current expectations
expressed or implied by the forward-looking statements include, but are
not limited to, factors associated with fluctuations in the market
price of precious metals, mining industry risks, risks associated with
foreign operations, the state of the capital markets, environmental
risks and hazards, uncertainty as to calculation of mineral reserves and
other risks. Reference is made to the risk factors and uncertainties
described in the Company's continuous disclosure record, a copy of which
is available under the Company's profile at www.sedar.com. In addition,
Minera Andes' joint venture partner, a subsidiary of Hochschild Mining
plc, and its affiliates do not accept responsibility for the use of
project data or the adequacy or accuracy of this release. . Similarly,
Hochschild denies any responsibility for Minera Andes's NI 43-101
Technical Report or for any of Minera Andes's Canadian securities
filings or for any information that Minera Andes has given to the
securities markets and any such responsibility is hereby disclaimed in
all respects.
Cautionary Note to U.S. Investors:
The United States Securities and Exchange Commission (the "SEC") permits
mining companies, in their filings with the SEC, to disclose only those
mineral deposits with "mineral reserves" that a company can
economically and legally extract or produce. We use certain terms in
this press release, such as "mineral resources", that the SEC guidelines
strictly prohibit us from including in our filings with the SEC.
|