SPOKANE, WA----July 25, 2006---- Minera Andes Inc. (TSX-V: MAI
and US OTC: MNEAF) is pleased to announce the results of on going
exploration drilling at the Kospi silver/gold vein discovered last year
at its San José project in southern Argentina. Prior drilling (see our
press release of January 19, 2006) discovered the Kospi vein and
identified mineralized vein over a strike length of 250 meters.
Subsequent drilling has now identified mineralization over a distance of
1.3 kilometers - a four-fold increase in strike length (see attached
map).
The discovery of high-grade gold and silver mineralization again
highlights the mining district scale of the project. The Kospi vein was
discovered during a 2005 drilling program in the area between the
Huevos Verdes and Frea Veins, both of which are currently under
development (see map).
The highest grade intercept encountered in the
current 2006 drilling campaign (totaling 5,500 meters) is 32.64 g/t
(1.04 ounces per ton - opt) gold and 4,567 g/t (147 opt) silver over
0.55 meters in hole SJD-227. Other highlights include 4.12 meters of
12.64 g/t (0.41 opt) gold and 336 g/t (11 opt) silver in hole SJD-216.
Holes SJD-225 and SJD-224 also encountered 18.63 g/t gold and 1,063 g/t
silver and 9.38 g/t gold and 1,432 g/t silver over 1.54 meters and 2.77
meters, respectively. The recent drilling indicates the Kospi vein is
an open-ended mineralized silver/gold vein that averages about 2.8
meters in width.
2005 Drill Intercepts Kospi Vein, San Jose Project
---------------------------------------------------------------------
From To Interval(i) Au Ag
Drill Hole (meters) (meters) (meters) (g/t) (g/t)
---------------------------------------------------------------------
HVD-39 54.18 57.70 3.25 1.00 57
---------------------------------------------------------------------
includes 54.18 55.08 0.85 2.56 118
---------------------------------------------------------------------
HVD-40 91.45 97.50 5.11 2.41 256
---------------------------------------------------------------------
includes 94.50 96.60 1.76 6.65 731
---------------------------------------------------------------------
HVD-41 90.85 98.18 6.22 18.24 574
---------------------------------------------------------------------
includes 90.85 96.51 4.79 23.60 743
---------------------------------------------------------------------
HVD-42 47.58 47.93 0.32 0.08 2
---------------------------------------------------------------------
((i)True width)
2006 Drill Intercepts Kospi Vein, San Jose Project
---------------------------------------------------------------------
From To Interval(i) Au Ag
Drill Hole/Vein (meters) (meters) (meters) (g/t) (g/t)
---------------------------------------------------------------------
HVD-43 Nil Nil
---------------------------------------------------------------------
HVD-44 73.84 79.67 5.23 3.92 350
---------------------------------------------------------------------
includes 78.72 79.67 0.87 9.24 1,109
---------------------------------------------------------------------
MSC-5 17.00 24.00 2.95 4.32 406
---------------------------------------------------------------------
HVD-51 76.1 76.7 0.53 0.67 35
---------------------------------------------------------------------
HVD-52 71.47 72.12 0.59 1.44 140
---------------------------------------------------------------------
and 104.45 108.00 3.19 0.16 11
---------------------------------------------------------------------
HVD-53 81.38 83.78 2.18 0.13 8
---------------------------------------------------------------------
SJD-216 104.96 107.77 2.56 7.91 46
---------------------------------------------------------------------
includes 105.80 107.77 1.36 13.15 76
---------------------------------------------------------------------
and 114.92 119.45 4.12 12.64 336
---------------------------------------------------------------------
SJD-217 137.12 144.56 6.73 1.01 136
---------------------------------------------------------------------
includes 137.90 138.96 0.96 5.69 855
---------------------------------------------------------------------
SJD-218 109.71 110.15 2.10 0.44 8
---------------------------------------------------------------------
SJD-219 81.10 84.64 3.20 6.57 750
---------------------------------------------------------------------
includes 82.75 83.08 0.94 16.70 1,580
---------------------------------------------------------------------
SJD-220 124.50 127.13 2.42 4.43 99
---------------------------------------------------------------------
includes 126.13 127.13 0.92 8.99 128
---------------------------------------------------------------------
SJD-221 153.57 154.58 0.92 38.19 346
---------------------------------------------------------------------
and 161.39 165.16 3.42 10.84 194
---------------------------------------------------------------------
includes 164.22 165.16 0.85 17.30 496
---------------------------------------------------------------------
SJD-222 232.90 238.36 5.78 0.35 24
---------------------------------------------------------------------
includes 234.35 235.03 0.61 1.00 118
---------------------------------------------------------------------
SJD-223 236.79 237.09 0.26 0.03 2
---------------------------------------------------------------------
SJD-224 193.92 196.95 2.77 9.38 1,432
---------------------------------------------------------------------
SJD-225 88.9 90.5 0.93 5.29 526
---------------------------------------------------------------------
and 100.42 102.13 1.54 18.63 1,063
---------------------------------------------------------------------
SJD-226 assays pending
---------------------------------------------------------------------
SJD-227 67.00 67.95 0.55 32.64 4,567
---------------------------------------------------------------------
and 125.75 130.82 4.51 0.02 0.67
---------------------------------------------------------------------
SJD-228 160.93 164.09 1.74 6.10 449
---------------------------------------------------------------------
SJD-229 98.92 102.60 2.11 5.00 85
---------------------------------------------------------------------
SJD-230 139.00 142.90 2.28 6.12 687
---------------------------------------------------------------------
SJD-231 267.91 268.74 0.48 0.04 8
---------------------------------------------------------------------
SJD-232 40.60 44.90 2.58 0.02 1
---------------------------------------------------------------------
SJD-233 assays pending
---------------------------------------------------------------------
SJD-234 assays pending
---------------------------------------------------------------------
((i)True width)
Allen Ambrose, president of Minera Andes, said: "The drilling at the
San José project continues to expand the project. The Kospi vein is
revealing significant potential to expand the reserves and mine life of
the project. In only six months we have increased the known silver/gold
mineralization at the Kospi vein from 250 meters to 1.3 kilometers,
again revealing the silver/gold potential of the San José project with
production planned for early next year."
As a follow-up to the new discovery at the Kospi vein, Minera Santa
Cruz, the joint venture corporation co-owned by Minera Andes (49%) and
Mauricio Hochschild & Cia. Ltda. (51%), will continue drilling to
define the limits of the vein. The discovery of new high-grade
silver/gold veins such as Kospi represents additional mineralization
that may add to the current reserves under development at the project
with further exploration. These discoveries also indicate the large
mineral potential of the San José property where more than 30 kilometers
of vein trend target is currently known to exist, of which less than 15
percent has been explored in detail.
Assay results for the drilling were reviewed by Brian Gavin, Minera
Andes' vice president, exploration, who is an appropriately qualified
person as defined by National Instrument 43-101. All samples were
collected in accordance with industry standards. Splits from the drill
core samples were submitted to Alex Stewart Assayers, Argentina, S.A.,
in Mendoza, Argentina, for fire assay and ICP analysis. Accuracy of
results is tested through the systematic inclusion of standards, blanks
and check assays.
Minera Andes is a gold, silver and copper exploration company working
in Argentina. Minera Andes holds about 500,000 acres of mineral
exploration land in Argentina, including the co-owned San José
silver/gold project now under construction and feasibility consideration
for possible mine production. Minera Andes is also exploring an
enriched copper zone at its Los Azules property and is acquiring other
exploration targets in southern Argentina. The Corporation presently has
152,359,596 issued and outstanding shares.
This news is submitted by Allen V. Ambrose, president and director of Minera Andes Inc.
For further information, please contact: Art Johnson at the Spokane
office, or Krister A. Kottmeier, investor relations -- Canada, at the
Vancouver office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Rd., Suite A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com
Vancouver Office
410-744 West Hastings Street
Vancouver, B.C. V6C 1A5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS: This press release
contains certain "forward-looking statements", including, but not
limited to, the statements regarding the Company's strategic plans,
evolution of mineral resources and reserves, work programs, development
plans and exploration budgets at the Company's San José Project. The
forward-looking statements express, as at the date of this press
release, the Company's plans, estimates, forecasts, projections,
expectations or beliefs as to future events and results. Forward-looking
statements involve a number of risks and uncertainties, and there can
be no assurance that such statements will prove to be accurate.
Therefore, actual results and future events could differ materially from
those anticipated in such statements. Risks and uncertainties that
could cause results or future events to differ materially from current
expectations expressed or implied by the forward-looking statements
include, but are not limited to, factors associated with fluctuations in
the market price of precious metals, mining industry risks, risks
associated with foreign operations, environmental risks and hazards,
uncertainty as to calculation of mineral reserves and other risks. In
addition, Minera Andes' joint venture partner, Mauricio Hochschild &
Cia. Ltda., does not accept responsibility for the use of project data
or the adequacy or accuracy of this release.
Cautionary Note to U.S. Investors: The United States Securities
and Exchange Commission (the "SEC") permits mining companies, in their
filings with the SEC, to disclose only those mineral deposits that a
company can economically and legally extract or produce. We use certain
terms in this press release, such as "mineral resources", that the SEC
guidelines strictly prohibit us from including in our filings with the
SEC.
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.