The resource and reserve estimates are based on 117 core holes, 32
reverse circulation holes and 3,285 meters of underground workings at
Huevos Verdes and 88 core holes at the Frea zone. The nominal spacing in
both zones is 35 meters along strike (horizontally) and 50 meters
vertically. The following summarizes the key assumptions, parameters and
methods used in the Resource and Reserve estimates:
• Gold assays were cut to 120 g/t, 20 g/t, 80 g/t and 100 g/t at Huevos
Verdes South, Central, North and Frea, respectively. Silver assays were
cut to 10,000 g/t, 1,000 g/t, 8,000 g/t and 4,000 g/t at Huevos Verdes
South, Central, North and Frea, respectively.
• Density was assigned as an average to the two principal mineralized
zones, Huevos Verdes and Frea. The values used for the estimate are
2.595 t/m3 for Huevos Verdes and 2.611 t/m3 for Frea.
• The geological model for both Huevos Verdes and Frea zones was
developed using a series of northeast oriented sections spaced
approximately 10 meters to 50 meters apart.
• Assays were composited to full vein-width interval.
• The estimation is done using Ordinary Kriging coupled with oriented search ellipses.
• Block grades were estimated based on interpretation of geological parameters logged in drill holes.
• Included in the resource estimate are 1,791 samples taken from the underground workings at 2 meter intervals.
Mining Method
The mine is designed to produce 750 t/d of gold and silver ore from two
separate structures, the Frea and Huevos Verdes veins, using underground
mining methods. Estimated mine life is 4.3 years with the current
reserve. Mechanized cut and fill mining will be used as the primary
mining method supplemented with conventional cut and fill mining.
Processing will consist of a crushing and grinding circuit followed by
flotation, concentrate, leach cyanide recovery and Merrill-Crowe
circuits. Power will be supplied by four diesel generators.
Capital Cost Estimates
The capital costs are estimated at $61.2 million, detailed as follows:

The construction schedule would cover a period of 14 months including
the completion of financing arrangements and the obtaining of operating
permits scheduled for the first quarter of 2006.
Operating Costs
The operating costs are based on a 750 tonnes per day operation and
include both the extension of the existing mine workings and new
construction of mine ramps and raises to complete development of the
mine.
The average life of mine total operating costs, including mining,
processing, and general and administration, are projected to be $79.92
per tonne of ore milled for a cash cost of $200.02 per ounce of gold
equivalent (using a price of $400/oz for gold and $6.50/oz for silver).

ProductionThe
processing facility is designed to operate at 750 tonnes per day. The
mill is scheduled to process approximately 1.17 million tonnes over 4.3
years. The annual ore throughput to the plant is 273,752 tonnes with an
average ore grade of 7.7 g/t gold and 406 g/t silver. During production,
the mine will employ approximately 570 individuals.
The study
includes environmental, closure and rehabilitation costs of $1,233,391
to fulfill all Argentinean legal requirements and comply with
international, best-practice, procedures.
GeologyThe
San José orebodies are defined by two northwest trending quartz veins
located in the center of the 50,000 hectare property. The Hueves Verdes
vein represents about 45 percent of the total reserves and the Frea vein
the other 55 percent. Both vein deposits identified are open at depth.
The Frea vein is open to the northwest and the Huevos Verdes vein is
open to the southeast. In addition, a resource exists at Saavedra West
that is not included in the reserve estimate.
The San José
project also hosts several other veins including the recently discovered
Frea Satellite and Odin veins where mineralization has been identified
along approximately 2 kilometers of strike length. To date over 32
kilometers of vein trend have been identified on the property and will
be the subject of future drilling programs.
Existing InfrastructureA
28-kilometer permanent all-weather road accesses the site. To date over
4 kilometers of underground workings have been developed on two levels
through two inclined shafts at the Huevos Verdes vein. Construction of
two underground ramps, one for the Huevos Verdes vein and the other at
the nearby Frea vein, is underway and base camp facilities have been
expanded to house the 330 employees and contractors.
A technical
report including the updated resource and reserve estimates and a
summary of the feasibility study will be filed with SEDAR within the
next 30 days in accordance with National Instrument 43-101. Brian Gavin,
Minera Andes' vice president of exploration and an appropriately
qualified person as defined by National Instrument 43-101, has reviewed
this news release.
The feasibility study and capital and
operating cost estimates were prepared by independent engineering firms,
MTB Project Management Professionals ("MTB") and AMEC Engineering
("AMEC") with input provided by project operator Mauricio Hochschild
& Cia. Ltda. ("MHC") and Minera Santa Cruz ("MSC"). The resource
model was prepared by MHC and MSC and audited by AMEC. The reserve model
was then prepared by AMEC. Other specific technical expertise included
the following:
• mine plan and processing plant -- AMEC and MTB
• metallurgical testwork and flowsheet -- AMEC and SGS Lakefield Research
• environmental, socio-economics, permitting, geotechnical engineering, and hydrogeology
-- Vector Peru and Vector Argentina.
The
San José project is held by MSC, the joint venture corporation co-owned
by Minera Andes (49%) and project operator MHC (51%). MHC is a large
private South American metal mining and cement production company,
specializing in the mining of vein-hosted metal deposits. MHC produces
about 250,000 ounces of gold, 10 million ounces of silver and
approximately one million tonnes of cement annually, and has annual
revenues of approximately $200 million.
The Road Ahead
Ambrose
commented, "As we advance the project the next step will be to optimize
and further refine parts of the study to develop the project
efficiently and for the lowest cost possible. Over the next few weeks an
engineering firm will be awarded a contract for the detailed
engineering and optimization work. Due to the advanced exploration,
development, and infrastructure at the site including a trained labor
force of over 350 workers and contractors, we are in an advantageous
position to rapidly move the project ahead."
Minera Andes is a
gold, silver and copper exploration company working in Argentina. Minera
Andes holds about 500,000 acres of mineral exploration land in
Argentina, including the co-owned San José silver/gold project now under
construction and feasibility consideration for possible mine
production. Minera Andes has also discovered an enriched copper zone at
its Los Azules property and is acquiring other exploration targets in
southern Argentina. The Corporation presently has 90,818,505 issued and
outstanding shares.
This news is submitted by Allen V. Ambrose,
President and Director of Minera Andes Inc. For further information,
please contact: Art Johnson at the Spokane office, or Krister A.
Kottmeier, investor relations -- Canada, at the Vancouver office. Visit
our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Rd.
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com
Vancouver Office
Suite A 410-744 West Hastings Street
Vancouver, B.C. V6C 1A5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
Caution Concerning Forward-Looking Statements:
This
press release contains certain "forward-looking statements", including,
but not limited to, the statements regarding the Company's strategic
plans, evolution of mineral resources and reserves, work programs,
development plans and exploration budgets at the Company's San José
Project. The forward-looking statements express, as at the date of this
press release, the Company's plans, estimates, forecasts, projections,
expectations or beliefs as to future events and results. Forward-looking
statements involve a number of risks and uncertainties, and there can
be no assurance that such statements will prove to be accurate.
Therefore, actual results and future events could differ materially from
those anticipated in such statements. Risks and uncertainties that
could cause results or future events to differ materially from current
expectations expressed or implied by the forward-looking statements
include, but are not limited to, factors associated with fluctuations in
the market price of precious metals, mining industry risks, risks
associated with foreign operations, environmental risks and hazards,
uncertainty as to calculation of mineral reserves and other risks. In
addition, Minera Andes' joint venture partner, Mauricio Hochschild &
Cia. Ltda., does not accept responsibility for the use of project data
or the adequacy or accuracy of this release.
Cautionary Note to U.S. Investors:
The
United States Securities and Exchange Commission (the "SEC") permits
mining companies, in their filings with the SEC, to disclose only those
mineral deposits that a company can economically and legally extract or
produce. We use certain terms in this press release, such as "mineral
resources", that the SEC guidelines strictly prohibit us from including
in our filings with the SEC. THE TSX VENTURE EXCHANGE HAS NOT REVIEWED
AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY