July 25, 2005
SPOKANE, WASHINGTON - July 25, 2005
- Minera Andes Inc. (TSX-V: MAI and US OTC: MNEAF) is pleased to
announce that Minera Santa Cruz S.A. ("MSC"), a company owned 49% by
Minera Andes and 51% by Mauricio Hochschild & Cia. Ltda., has
accepted a letter of offer from Standard Bank Plc ("Standard Bank") and
Bayerische Hypo- und Vereinsbank AG ("HVB") to provide a limited
recourse project finance loan facility of up to US$50 million for
construction through production at the San Jose/Huevos Verdes
gold/silver project in Argentina. The offer from Standard Bank and HVB
was chosen after a competitive tender process and negotiations with
several consortiums of international banks all well recognized as having
extensive mining finance experience.
The US$50 million debt
facility to be provided by Standard Bank and HVB is subject, among other
things, to completion of a bankable feasibility study, bank due
diligence, documentation and certain regulatory approvals. It is
anticipated that the facility will be available for drawdown in the 1st
quarter of 2006. The facility is substantially non-recourse to Minera
Andes and Mauricio Hochschild. As part of the overall facility amount,
there is a stand-by facility of up to US$5million available for
unanticipated cost over-runs prior to completion and commercial
production. The commercial terms of the loan are customary for a loan of
this nature and include certain fees and expenses with interest rates
of Libor + 3.0% pa prior to project completion and LIBOR + 2.75 to 3.0%
pa thereafter.
Allen Ambrose president of Minera Andes, said:
"The highly competitive interest shown by Standard Bank and HVB in
bidding for this project financing speaks to the project's quality and
underlying economic strength. Based on a positive feasibility outcome
the loan facility will allow us to move forward quickly to complete
construction and place the San Jose project into production, expected
during 2006."
Standard Bank is a major provider of corporate
finance, project finance and advisory services in the mining, resources
and commodities industries. It has grown from its strong position in
South Africa and has developed a leading reputation in emerging markets
across Africa, South America, Central and Eastern Europe, the Middle
East, and Asia. HVB Group is among the ten biggest banks in Europe and
is a leading project & structured finance bank. HVB has built a
strong reputation as global mining finance arranger with dedicated
mining professionals in all continents. It focuses on arranging and
underwriting debt facilities.
Minera Andes is a gold, silver and
copper exploration company working in Argentina. The corporation is
funded with working capital of about US$4.0 million. Minera Andes holds
about 500,000 acres of mineral exploration land in Argentina, including
the co-owned Huevos Verdes/San José silver/gold project now under
construction and feasibility consideration for possible mine production.
Minera Andes has also discovered an enriched copper zone at its Los
Azules property and is acquiring other exploration targets in southern
Argentina. The Corporation presently has 90,549,719 issued and
outstanding shares.
This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc.
For
further information, please contact: Art Johnson at the Spokane office,
or Krister A. Kottmeier, investor relations - Canada, at the Vancouver
office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Rd., Suite A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com
Vancouver Office
410 - 744 West Hastings St.
Vancouver, B.C. V6C 1A5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
FORWARD-LOOKING
STATEMENT - Although Minera Andes believes many of its properties have
promising potential, its properties are in the early stages of
exploration. None have yet been shown to contain proven or probable
mineral reserves. There can be no assurance that such reserves will be
identified on any property, or that, if identified, mineralization may
be economically extracted. There can be no assurance that the San
Jose/Huevos Verdes gold/silver project will be found to be economically
feasible or that a mine will successfully be constructed. In addition,
Minera Andes' joint venture partner, Mauricio Hochschild & Cia.
Ltda., does not accept responsibility for the use of project data or the
adequacy or accuracy of this release.
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.